Wednesday, November 9, 2022

My EcoBalance 2022 conference experience

This is Zhao Han, a Ph.D. student in the Kawasaki Lab. Here, I would like to record my participation in the International Conference on EcoBalance 2022 from 31 October - 2 November.

The International Conference on EcoBalance, organized by the Institute of Life Cycle Assessment, Japan (ILCAJ), is held every two years. Recognized as one of the world's premier conferences for professionals from academia, industry, and government, the Ecobalance 2022 is in its 15th year and is held at the Fukuoka International Congress Center.

I was thrilled to attend for the first time! I met with researchers from major Japanese universities such as the University of Tokyo, Waseda University, Kyushu University, and Tohoku University, as well as other prestigious universities around the world such as ETH, Yale University, and Leiden University. The sessions were held in separate sessions for different topics. Due to the large number of accepted topics, many sessions were held in parallel. We need to check out the sessions that interest us and then go to a specific venue at a specific time.

In addition to the sessions, the conference also featured presentations by industry experts. For example, Mr. Hiroshi Ozeki from Nissay Asset Management Corporation spoke about Trends and expectations in the investment industry for carbon neutrality. It is believed that these explorations will significantly contribute to improving environmental and social sustainability in the medium to long term.

Meanwhile, listening to the fluent and confident presentations of others at the conference immediately made me feel a lot more stressed. At the conference, I presented to the audience some of the progress of my research on determinants of changes in crucial environmental indicators for Global Commons Stewardship in China based on the MRIO model. I also received a lot of helpful comments during the conference. Once I finished my presentation, I was finally able to start enjoying the conference.

I traveled non-stop to the different sessions to listen to the topics that interested me, which greatly enriched my perspective. On the evening of the 31st, I attended the Ecobalance Young Researchers' Workshop, where Professor Dr. Matthias Finkbeiner from Technical University Berlin gave a very interesting and humorous presentation on practical LCA. It was the first time I had a complete understanding of LCA assessments!

Overall, the various experiences of the conference were an incredible eye-opener for me at the time and also honed my ability to act and judge independently, it was very memorable.


Monday, October 31, 2022

~UNDP’s Mission~Partnership with Japan and Career

 

【イベント案内】

~UNDP(国連開発計画)’s Mission~

 Partnership with Japan and Career

 We are pleased to welcome Mr. Steve Utterwulghe, Director of Public Partnerships at UNDP, to learn about the organization and its operations, career development in the field of international development, and its partnership with Japan. He will also talk about UNDP’s vision and activities to eradicate poverty and achieve SDGs.

Title: UNDP’s Mission, Partnership with and Career

Speaker: Mr. Steve Utterwulghe, Director of Public Partnerships, UNDP

Date and time: Monday, 7 November 16:30-17:30

Venue: Eng. Bldg. No.1 Room 17 (2nd floor 234) / 工学部一号館17号教室

Language: English

Moderater: Kawasaki

No signups, all of you are very welcome to join this seminar!

Please see below for further information. 






Tuesday, October 18, 2022

10/22日 ぼうさいこくたい2022セッションに登壇します! 「21世紀前半に発生が確実視される国難級災害を乗り越えるための,レジリエンス確保のあり方」

            
          ~☆川崎 登壇します☆~ 

日時: 10月22日(土)14:30~16:00 
ぼうさいこくたい2022セッション / 日本学術会議公開シンポジウム 

「21世紀前半に発生が確実視される国難級災害を乗り越えるためのレジリエンス確保のあり方」

の セッションに登壇します!(セッション番号S-18) 

現地会場(兵庫県神戸市 JICA 関西)とオンライン(Zoom)のハイブリッド開催となりますので、 是非、Zoomで参加してください。 

現地会場、オンライン接続先等の詳細については、下記をご参照ください。
○ぼうさいこくたい2022のページ(セッションS-18)
○日本学術会議ホームページ  





Thursday, September 8, 2022

初めての学会発表!

川崎グループM2の安藤です.9/5~7まで京都に行ってきました! 学部生の頃,私は洪水が常襲する途上国での洪水被害に関する研究をおこなってきました.特に教育年数や性別などの個人属性に着目して,洪水被害を分析しました.私の研究では,洪水被害を特徴付ける指標として,個人の収入損失に着目しました.分析の結果,農村部の女性を除いて,教育年数が長くなるほど,収入損失が小さくなることがわかりました. この結果を,卒論の最終発表で社会基盤学科の皆様にオンラインでお伝えすることはできましたが,日本全国で自分の成果を発表できる機会が欲しいと思い,水文水資源学会に参加することにいたしました. 本学会は,下図のような京都大学宇治おうばくプラザで行われました.
京都大学に訪れるのが初めてで,かつ非常に大きなホールで皆の前で発表するという機会がなかったので,非常に良い経験となりました.水文学の専門家が多く発表を聞いている中で,まだ水文学に関する知識もそこまで深くない自分が発表するのは非常に緊張しました. また,発表では同大学の生研に所属している山崎先生の発表が特に印象的で,既存の論文の形態にとらわれず,オピニオン論文として,新たな枠組みを設定することで,より多くの論文提出の機会を提供できるようになるとのことでした.一般的な論文の形式とは外れてしまいますが,非常に価値の高い主張というのは数多く存在すると思うので,このような通常の成果だけではなく,様々な論点での発表機会を与えてくださる本学会は非常に有意義だと感じました.下図が本学会の発表の様子です.
さらに,他にも,水文学の専門家の私にとっては非常に難しく感じる発表から,数人の学科同期の発表も聞くこともでき,非常に多くのことを学べました. この発表会場が宇治にあり,近くに平等院鳳凰堂があったので,学会が始まる前の空いている時間に平等院鳳凰堂も訪れ,日本の歴史や京都の風情も感じることができ,個人的には大満足の3日間でした.
最後に,このような貴重な学会発表に機会を提供してくださった,水文水資源学会の会員の皆様,このような機会を提案してくださった川崎先生に非常に感謝しております! 最後まで読んでくださり,ありがとうございました!

Saturday, September 3, 2022

 

Visitation at Urayama dam and Takizawa dam

Hello everyone, this is Zhang Zhaoyu a M1 student in the Kawasaki Lab. So glad to introduce you the visitation we had on August 26th, 2022.

This is a visitation organized by the Japan Society of Dam Engineers.

We visited two dams located in the Arakawa River basin ( Urayama Dam and Takizawa Dam). We learned basic information about these two dams and also watched how the work are doing by the staff at the dams.

1.           The first one was Urayama Dam:

The dam height of Urayama Dam is 156m and the dam length is 372m. the total water storage capacity is 58 million m³ (of which 2 million m³ is the sediment accumulation capacity), and it is a multi-purpose dam that regulates floods, provides water, controls the river environment and generates electricity.


1.1 Flood control

The Urayama dam takes the 100-year flood (1000m³/s) as the design flood and has a flood regulation capacity of 23 million m³ during the flood season. When the design flood comes, the dam is released at 110m³/s and the remaining water is stored in the reservoir.

In reality, the largest flood was a record 420m³/s in 2019 when Typhoon 19 came. Urayama dam has been used safely during floods so far.

1.2   Water suply

The Urayama dam can provide 4.1m³/s water, of which 65% is provided to Saitama, 29% to the Tokyo City, and the remaining 6% to the Chichibu area. It is an important source of water supply for the Arakawa River basin.

1.3   Water environment

The Urayama dam is often affected by the fact that the water becomes turbid after heavy rainfall. Many businesses downstream (fisheries, factories, domestic water, etc.) are affected. The management has taken a series of measures to solve this problem. Like, the water intake is located about 6km upstream of the dam and the entire pipeline is made of steel and reinforced plastic pipes.


To prevent insufficient oxygenation of the water in the reservoir, six supplemental air devices have been installed upstream of the dam to ensure water quality.

There are also devices to prevent driftwood.

1.4   Power generation

The Urayama dam uses this water to generate electricity while releasing water downstream and has a capacity of 5,000kw. At the time we visited it, it’s running in 2.6 m³/s.



We can see that there are two drainage holes here, one large and one small. The large one has a drainage capacity of 40m³/s and the small one is 2m³/s. When we need to adjust the water release in 0.1m³/s, it will be more convenient to use the small hole, and when we need to release a large amount of water, it will be more convenient to use the large hole.

2.           Takizawa dam

Takizawa dam has a dam height of 132m, a dam length of 424m, and a total water storage capacity of 63 million m³ (of which 5 million m³ is the sedimentation capacity)

Its function is basically the same as Urayama dam.


2.1 Flood control

The Takizawa dam has a 100-year flood level of 1850m³/s, of which 300m³/s will be released and the rest will be stored in the dam, corresponding to a flood regulation capacity of 33 million m³ during the flood season.

The actual maximum flood record is still Typhoon 19 in 2019, when the flood flow was 700m³/s. So far the operation of Takizawa dam in the flood season is still safe.

2.2   water supply

The water supply of Takizawa dam is very similar to that of Urayama dam. It provides 4.6m³/s of water supply, 81% of which is supplied to Saitama and 29% to Tokyo.

2.3   Water quality

The water intake facility is operated to draw water from a high turbidity layer during discharge, and to preserve the fresh water layer. When there is no need to discharge, the goal is to keep the water temperature when we take the water.

2.4   Power generation

Like Urayama dam, Takizawa dam has a generation capacity of 3400kw.

At the time we visited it, it’s running in 1.5m³/s.

3.           Spill way

The Urayama dam has a common spillway (3m³/s) and two spillways for extraordinary periods without gates (natural overflow).

The Takizawa dam has a common water intake as well as three emergency spillways with arc gates, which are operated by the winches inside the dam on both sides. These machines are well maintained, and the workers also draw red lines on the screws to keep an eye on the status of the machines.


4.           Dam Safety Monitoring

This device can monitor the deformation of the dam.

There are also equipments at the bottom of the dam to monitor the dam leakage and lift pressure to ensure the stability of the dam in several ways.

At the left bank of Takizawa dam, a concrete revetment was made to prevent soil erosion. Based on the color difference of the revetment, we can also determine the long-term water level of the dam.

5.           Sediment

The amount of sediment in the watershed is relatively high because of typhoons and other reasons. The sediment is used locally to fill the part washed away downstream or carried to other places for other uses.

There are about 13000t sediment over this place.


This place was originally a reservoir, but because of Typhoon 19, this reservoir was completely filled with sediment. We can still see some concrete structures, but the former road and the appearance of the reservoir are completely invisible.

At last

This visitation was quite an experience. Dam management is now really digital. In the control center of Takizawa Dam, we can observe the overall situation of the dam with the naked eye, and at the same time, we can understand the parameters of the dam in real time through various digital monitoring devices. The data is stored in the computer, which is very useful for future management and research.

Learning about these two dams on the Arakawa River Basin made me more aware of the role of dams in stabilizing water supplies and preventing natural disasters such as floods and droughts, and how hard our stable lives are to come by. All these cannot be achieved without the efforts of the dam design department and the management department.

Sunday, August 14, 2022

初めてのタイ,初めての海外

こんにちは。M2の五十川です。

先日,中村さんの研究の一環としてタイへ現地調査に行ってきました。

コロナ禍もあったので配属から3年目にして初の海外での調査でした。今回は8/1〜4のアユタヤ視察の,後半の2日間と前後のバンコクでの活動について書いていきます。


8/3 @セーナー地区

セーナー周辺は昨年2021年での洪水でも浸水被害を受けた地域でした。2011年・2021年と2回の大洪水を受けたため,浸水対策を自ら行っている家が多くありました。調査を訪れた当日も,大洪水が来た場合にも家屋の浸水を免れるために高床住居をさらに高くする工事を行っている住居も見受けられました。

浸水した跡がくっきり

洪水の被害の爪痕がいまだに残っている場所もあり,被害の大きさを改めて実感しました。

午後は役所に訪れて洪水発生当時や発生後の補償等についてお話を伺いました。急に訪問したにも拘らず親切に対応してくださいました。

セーナー地区の役所にて


8/4 @バーンバーン地区

バーンバーンもセーナー地区同様昨年の洪水被害を大きく受けた地域でした。

幸い家屋の浸水は免れた住居でも,洪水に伴う土砂の侵食被害が大きくても補償が得られない(家屋が浸水することで補償金が出る)等浸水被害以外で悩む方や,諸条件が重なり浸水被害を受けてもまだ補償が得られず,家を修理するお金が不十分で困っている方等,今でも資金面で課題は残存しているように見えました。

すぐ横はチャオプラヤ川

また,訪れたご家庭の中にはご家族が病院勤務者の方がいて,LINE電話(タイでも日常的に使用されているようです!)を介して昨年の洪水時での救助や病院での状況についてお話を伺うこともできました。

LINE電話を介した調査の様子


8/5 チュラロンコン大学見学&調査結果発表

前日にバンコクに戻り,この日は朝からチュラロンコン大学に訪れました。

まずはキャンパスツアー。建物や道路,広場の規模がどれもこれも大きく,うちの大学よりもすごく広々としていて羨ましいな〜と感じました。ただ驚いたのは大学でも制服があるということ。この日は翌週から授業が始まるタイミングで,制服を着た多数の新入生と見られる人々がキャンパス内を歩いていました。

白い所も含め全部がチュラ大の敷地だそうです。広すぎる…!

ツアー後は都市地域計画を専門とするSutee先生の研究室にお邪魔し,この4日間での活動報告を行いました。アユタヤでの調査ではSutee先生の研究室の学生の方々にも同行していただいたこともあり,調査結果に対する密度の濃い議論を交えてコメントを頂きました。

発表の様子

冒頭にも書きましたが,M2にして初めての海外での調査でした。過去に研究室のメンバーの,海外を対象とした同様の研究テーマに関する発表を聞いていても,実態が十二分に把握できず歯痒く感じていました。今回の調査を通し,実際現地に訪れることでわかる「生の声」を直接肌で感じ取れた経験は非常に価値のあるものだったと思います。

加えて,個人的には初のタイ,いや生まれてから24年目にして初の海外でした。タイに行く前は不安でいっぱいでしたが,現地の方々が親切に接してくださったお陰で何の大きな事故もなく1週間滞在でき,最終日には日本に帰りたくないと思えるぐらい充実したものになりました。不安感を払拭できたこの成長は,生涯大いに役立つかもしれないと感じました。

最後に,今回の調査に携わってくださった全ての方々に感謝の意を申し上げます。本当にありがとうございました!

Wednesday, August 10, 2022

研究対象地、タイに行ってきました!

川崎グループM2の中村です。7/30から8/6まで、タイに行ってきました!

現在私はタイでの洪水と貧困の研究をしています。タイに限らず、経済の中心地を守るような治水事業が行われがちであり、その影響でかえって貧困層の被害が深刻化することがあります。そこで私の研究は、貧困層・地域内格差も考慮しながら、政策の意思決定を支援することを目標にしています。今回は、主に貧困世帯での洪水の影響を把握するために、調査にいきました。今回のブログでは、8/1,2のアユタヤ視察について書きたいと思います。


8/1 am @ロジャナ工業団地

日本企業も多く進出するロジャナ工業団地を見学しました。2011年に起きた大洪水が工場に甚大な被害をもたらしたため、各工場の周りには高い壁が築かれていました。


柱上部の線が2011の浸水高

8/1 pm @ロジャナ工業団地近辺の集落

この地域は、ロジャナ工業団地の高い防水壁の影響で浸水深が増大してしまうことがシミュレーションにより分かっています。しかし、工業団地で働く従業員の寮があるなど、工場を守ることでそこで働く人はむしろ大きな被害を受けてしまうのが皮肉だと思いました。また、個人商店を営む世帯に聞き取りを行ったところ、小さな会社で働いていた奥さんが洪水の影響で失業してしまい、それからずっと生活が苦しいという話を聞くことができました。工場や裕福な世帯にとっては被害は一時的でも、貧しい方にとって被害は長く苦しいものだと再認識させられました。



8/2 am @ロジャナ工業団地周辺の集落

前日とは別の地点でも世帯調査を行いました。印象的だったのは2点です。まず、貧しい世帯では借金の返済にかかる利子に長年苦しんでいることです。洪水で被害を受けた家屋を修復するために借金をした、という世帯では10年以上たった今も返済ができておらず、利子が蓄積されてしまっているようでした。そして、2点目として、これらの世帯では家屋の修復で精一杯で、家屋をより頑強のものにする、という次の洪水への備えはできていないということです。様々な世帯で被害額を伺うと、家屋の修復にかかる費用は、事前の補強にかかる費用よりも格段に大きいことがわかりました。しかし、貧困世帯には、補強するお金はなく、結果として大きな被害を受け、借金に陥る、とても皮肉で悲しい事実を目の当たりにしました。


8/2 pm @チャオプラヤ川クルーズ


アユタヤ遺跡周辺をボートに乗って回りました。河川沿いは護岸や嵩上げがしっかりしているところもあれば、今にも沈んでしまいそうなところもありました。また、個人的に
印象に残っているのは、河川沿いにおしゃれな飲食店などが多数あったり、堤防上で談笑している学生がたくさんいたりしたことです。日本の川と比べるときれいとは言えないチャオプラヤ川ですが、やはり川の周りで様々な活動が生まれるのは共通していました。


ボートの上から遺跡も見れました!


私は、B4の頃から似たトピックを扱っていましたが、コロナ禍で海外での調査が難しく、もどかしい思いがずっとありました。今回ようやく現地の状況を自分の目で見て、現地の方の生々しい話を聞いて、非常に勉強になりました。

貴重な機会をありがとうございました!